Get a quote now call 07 870 1135 or email admin@jdc.net.nz

Back to Blog

Cobham Dr Enabling Works

This project involved the bulk earthworks associated with the formation of a new drain and batter slopes within a live flow gully environment. Concentrated Cut to Fills and Waste were undertaken by JDC involving double handling and temporary stockpiling of materials.This was a challenging section of work in with extremely poor ground conditions and example of a successful partnership between JDC and GT Civil as the Head Contractor....

November 28, 2023

Swayne Rd – Venture Developments/Freedom Villages

This project involved completing the bulk earthwork associated with the swale drain, temporary pond formation and dewatering, sub-division formation inclusive of cut to fills and cut to waste.Dust Control and Tracking on roads within the existing residential environment were key requirements on this project and well managed with minimal impact on surrounding stakeholders....

November 28, 2023

Mangaonua Gully and Resolution Dr Sections

Mangaonua Gully:The project involved construction of a new stream alignment under live flows and Regional Council Consents and Monitoring. Installation of Rip Rap Lining, Overpumping/Dewatering and Bulk Earthworks associated with Cut to Filling the old steam route.  Resolution Dr:The project involves construction of 2km of local road from sub-grade to top of SIL including swale drain formation and lining. 200,000m3 of SIL import and placement.4km of Lined Swale Drain formation inclusiv...

November 28, 2023

Land Development - Sir David Fagen

The project involved construction of a 5m wide accessway in Te Kuiti to service 7 New rural lots. Works included carriageway construction, cartage backfill and compaction of circa 400m of pavement and associated drainage....

November 28, 2023

Infrastructure: Peacockes Bridge – R1 Section

This project involved completing the bulk earthwork associated with the construction of the new peacockes bridge development in Hamilton. Scope included environmental controls, Bulk earthworks, subgrade construction and crane pad construction. Dust Control and Tracking on roads within the existing residential environment were key requirements on this project and well managed with minimal impact on surrounding stakeholders. Dust Control and Tracking on roads within the existing residential enviro...

November 28, 2023 Posts 1-5 of 5 | Page